IT-INFRA FACILITY
S. No | Updation in system | No of systems included | Year of Updation | Configuration |
1 | COMPUTERS | 225 | 2008 | HP 512MB/ 80GB / CRT MONITOR |
2 | SERVER | 02 | 2008 | HP 1GB RAM / CRT MONITOR |
3 | COMPUTERS | 320 | 2010 | HP 1GB RAM/ 320GB HDD /TFT MONITOR -18.5′ |
4 | WORKSTATIONS | 30 | 2010 | HP INTELC2D/ 4GB/ 320GB / TFT MONITOR -18.5′ |
5 | SERVER | 04 | 2010 | XEON QC 2GB/2X146GB / TFT MONITOR -15.6′ |
6 | SERVER | 01 | 2010 | XEON QC 4GB/2X146GB / TFT MONITOR -15.6′ |
7 | COMPUTERS | 20 | 2013 | DELL OPTIPLEX i3/ 4GB/500GB / TFT MONITOR -18.5′ |
8 | INTERNET BAND WIDTH | 1 | 2019 | UPGRADED TO 120 Mbps |
Wi-Fi Access Points were installed in the following locations. The Wi-Fi access points are updated as and when required.
1. HP – Procurve Switch – 2010
2. D- Link – switch – 2017
Details of Wi- Fi Access points:
S. No | Location | Nos available |
1 | Main block Ground floor – Coridor & Office | 2 |
2 | Main block Ground floor – Reception | 1 |
3 | Main block Ground floor -Management cabin | 1 |
4 | Library | 1 |
5 | Main block First floor – corridor | 2 |
6 | Main block Second floor – corridor | 2 |
7 | Main block Third floor – Exam cell | 1 |
8 | Main block Third floor – MBA dept | 1 |
10 | Main block Third floor – MCA DEPT | 1 |
12 | EAST Block- Ground floor – MCO dept | 1 |
13 | EAST Block- First floor – EEE dept | 1 |
14 | EAST Block- Second floor – IT dept | 1 |
15 | EAST Block- Third floor –Corridor | 1 |
16 | EAST Block- Fourth floor –Auditorium | 1 |
17 | WEST Block – Ground floor – AERO dept | 1 |
18 | WEST Block – First floor – CIVIL dept | 1 |
19 | WEST Block – Second floor – MECH dept | 1 |
20 | WEST Block – Third floor – MECH dept | 1 |
21 | WEST Block – Fourth floor – West block auditorium | 1 |
22 | East Lab BLOCK & Coridor | 3 |
23 | West Lab Block | 2 |
24 | Hostel | 1 |